| At SLCC, lives are changed and faith is built. God becomes real and Christ becomes one's life companion. |
About the Campaign |
Church Campaign Resources |
|
Overview of Church-Based Campaigns Organizing Your Church Campaign Committee |
Alumni/ae Support |
How to GiveSend pledges to Bev Hughes, Connecticut Conference UCC, United Church Center, 125 Sherman Street, Hartford, CT 06105. Send gifts payable to the Missionary Society of Connecticut to the same address. Please include the notation "Now for the Future" or "NFTF" in the memo section of the check. |
Silver Lake is a storied, beloved place. It’s where our Connecticut UCC family gathers, laughs, learns and grows. But for Silver Lake to grow – to remain the vital heart of our outdoor ministry — it needs our help. And it needs us now.
Each year – throughout the year — this 61-acre site in Sharon serves more than 5,000 conferees, guests and members of our church community. And while most other denominational facilities rely heavily on use by groups from outside the denomination, Silver Lake is truly ours — 98% of Silver Lake use is Conference-related.
Clearly, Silver Lake is central to our Christian ministry — especially with our youth, who are, after all, both the present and the future of our Church.
But in order to remain the inspiring place it has been for almost 50 years, Silver Lake needs to adapt to the changing needs of our church community. All the current yearround lodging facilities at SLCC were built more than 32 years ago for a very different era. Code and safety requirements, guests’ expectations, and disability access needs have all changed. The sizes of groups visiting SLCC have changed. And the condition of the buildings has declined dramatically.
To re-invigorate Silver Lake, we must renovate and rebuild. And we must begin Now, for the Future.
All the proposed changes to Silver Lake Conference Center are guided by one firmly held principle: we must be enlightened, responsible stewards of this beautiful place. In order to do so, we have ensured that the work adhere to several criteria:
|
| God has given us the capacity to achieve this critical, ambitious undertaking -- all that is needed is the will and commitment among our churches and members! |
|
| Few of us can imagine the Connecticut Conference without Silver Lake and its ministry -- it is the heart and soul of so much of what we do. |
In 2004, the Connecticut Conference Board of Directors authorized a Strategic Plan for Ministry for Silver Lake Conference Center to assess, in detail, what needs to be done. To this end, the Conference hired Kaleidoscope, Inc., a nationally known consulting firm specializing in camp and conference center operations. After a thorough, sixmonth investigation and study, the firm recommended several key changes to the facility’s physical site and management systems. In short, the consultants found that most of the buildings at Silver Lake are sorely in need of renovation, that several structures need to be redesigned for both flexibility and energy-efficiency, and landscaping is needed to enhance and preserve the property
Using this report as a starting point for the schematic design process, in May of this year the Conference hired Susan Maxman & Partners, of Philadelphia, to implement the recommendations. Over this past summer, key leaders of the Conference and Silver Lake met three times with the architectural firm, which has refined the vision for Silver Lake by producing a detailed set of schematic design drawings, renderings, reports, and cost estimates.
Happily, some of the work needed at Silver Lake has already been done. For example, bathrooms have been upgraded in many buildings, new furniture and mattresses have been purchased, and we have many new, urgently needed summer cabins.
Still, we have a long way to go. In addition to the specific projects detailed below, plans call for changes to several ancillary buildings and activity spaces. For example, we will move all maintenance and construction activities to a single location behind the manager’s house for safety and efficiency.
We look forward to landscaping and other site improvements, too. New basketball and volleyball courts will be created, traffic patterns improved, and a variety of new landscaping and campfire locations will be established. A new amphitheatre and better summer greeting space will be developed near the current Social Hall, as well.
Many of the proposed changes address the need for “right-sizing”: often our churches’ retreats do not fill the large buildings, yet we have more requests than we can accept. The average size retreat today is approximately half what it used to be, so getting the retreat spaces the right size can make a big difference in Silver Lake’s effectiveness and our churches’ use of it as a resource.
We also need to be realistic about expectations: today, adults do not want to sleep in bunkrooms with eight other adults, nor do they want to share bathroom facilities! The new Retreat Center, Retreat Lodge and Guest Lodge (the three buildings proposed to replace the existing Retreat Center, which must be torn down) will have private baths with bedrooms accommodating one to three persons. Simple and economical, yet adult-friendly, these lodges will also provide gathering and small group space.
Finally, we are dedicated to both energy efficiency and economy. Windows must be replaced and heat changed from electric to oil in the Cedars, the Pines and the Glen retreat centers. The payback from these improvements alone will help immensely in controlling costs.
Some of the new construction involves renovation of existing structures; in other cases, the existing facilities need to be razed and new buildings built in their place. All new buildings will be winterized, except where noted. All are designed to be energy-efficient and handicapped accessible, and bathroom facilities throughout SLCC will be updated.
The Dining Center is the cornerstone of our plans.
Consisting of a dining hall, which doubles as a large
meeting space, and associated kitchen facilities, this
building will accommodate 200 guests. It will also
serve as a program center and storm shelter during
the summer. Building a new dining hall central
to the year-round facilities
both frees up the lower level of Cedars for
additional youth retreat and summer staff lodging,
and expands our ability to serve more meals.
By concentrating heating and other mechanicals
in this one building, we conserve maintenance
and energy resources.
One new Showerhouse will be constructed with both shower
and restroom facilities for summer use. The existing restroom
and shower house will be refurbished.
The Guest House
will include 6
guest rooms with
baths, with a total
capacity of 18.
The Retreat Lodge is
planned to contain 8
guest rooms with baths
(for a total capacity of
24) and associated
meeting spaces.
The Retreat Center will contain 12
guest rooms with
baths and associated
meeting spaces,
with a total
capacity of 36.
The Commons Buildings are
group activity structures for
summer occupancy only.
One Commons is located
in each cabin grouping and
each has lodging for deans
(conference leaders).
The plans include options
for two different sizes.
Such an ambitious, creative vision does, of course, require a substantial investment. We are asking you, a valued member of the Connecticut Conference community, for help. In giving to Now, for the Future, you are investing in our past, present and future. You will be helping to preserve and reinvigorate a place critical to our heritage in Connecticut. You will be protecting its current viability and strength. And, most important, you will help ensure that the future is one in which our young people can learn and grow in their life’s ministry as they share – as we have been blessed to do – in God’s abundance.
We made some difficult but necessary decisions to bring the campaign within achievable goals, and now project that the campaign will focus on a basic goal of $8 million with a challenge goal of $12 million. This is a significant decrease from the original projection.
Figures include all construction costs, a 10% contingency, and all fees for design, construction management and fund raising. Construction will be phased, according to need and practicality.
| Phase 1 | Phase 2 | |
|---|---|---|
| Commons Buildings and Social Hall Renovation | $ 732,218 | |
| New Showerhouse | 499,843 | |
| Other Renovations for Summer season | 342,319 | 247,176 |
| New Dining Ctr/Program Space | 2,263,662 | |
| Cedars/Pines/Glen/Lodge Renovations | 1,742,542 | 361,089 |
| New Retreat Center | 1,838,775 | |
| Build out lower level of guest rooms | 600,000 | |
| New Maintenance Facility and Deferred Maintenance | 572,260 | |
| New Retreat Lodge | 1,414,279 | |
| New Guest House | 1,073,658 | |
| Totals | $7,991,619 | $3,696,202 |
| Tithe for Back Bay Mission | $799,161 | $369,620 |
Pledge Period: 2005-2010
October 2005: Vote by the Fall Annual
Meeting, the quiet
phase begins
May 13, 2006: Report to the Spring
Annual Meeting
October 20-21, 2006: Launch of the
Church Phase at Fall Meeting
The Campaign for Silver Lake
Hugh and Kate McLean, Co-chairs
David Peters, Co-chair
Connecticut Conference, United Church of Christ
125 Sherman Street
Hartford, CT 06105-2281
860.233.5564
campaign@ctucc.org